Public Works (with competition

WABellevuecityOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

PO TERMS AND CONDITIONS FOR PUBLIC WORKS (CONSTRUCTION w/ ITQ) The following terms and conditions apply to all procurement of Work by or on behalf of the City unless specifically provided on the front of this document and/or incorporated by reference herein. 1. SCOPE OF WORK: Contractor shall remove all tools, scaffolding and surplus 1.1. Contractor shall perform and complete the work materials and shall leave the Project Site broom clean or its described on the front of this document or reasonably inferable equivalent. If the Contractor fails to clean up as required by there from, including all demolition and construction services, this Agreement, the City may do so, and the costs associated supervision, administration services, coordination of all with such cleanup shall be charged to the Contractor. Subcontractors, tests, inspections, and other items that are 5. STANDARD OF PERFORMANCE necessary to and appropriate for the furnishing, equipping and 5.1. Contractor warrants and guarantees to the City that the functioning of the facilities and structures, together with all Work shall be performed in a manner consistent with a high additional, collateral and incidental work and services required standard of construction practices for projects of a similar for completion of the work (“Work”). nature and in a workmanlike manner in accordance with 1.2. As part of the Work, the Contractor shall furnish and industry standards. Contractor covenants and warrants that it assume full responsibility for everything required for the orderly shall be responsible for performing and completing, and for progress and proper execution and completion of the Work, causing any Subcontractors to perform and complete the Work whether temporary or permanent and whether or not in a workmanlike manner in accordance with industry incorporated in the Work including, but not limited to, materials, standards and in accordance with all laws. equipment, labor, transportation, construction, equipment and 5.2. All construction shall be subject to tests and inspections machinery, tools, appliance, fuel, power, light, heat, at all reasonable times and at all places prior to acceptance. transportation, telephone, water, sanitary facilities, temporary The Contractor shall afford safe access to the Work Site upon facilities, utilities, and all other facilities and incidentals. reasonable request by the City or any governmental agency to 2. TERM: perform tests, inspections or observations.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Washington. 1,357 open bids in Washington — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4091868

Open Other Bids in Washington

WACountyOpenTODAY
King County Job Order Contract (JOC) 2027 - Parks
King County · #KC001707
Other
WACityOpenTODAY
Addendum #4 (09-02-2026)
Renton
Other
WACountyOpenTODAY
Licenses and Support, Palo Alto PA-220s & PA440s
Snohomish County · #QT-26-0823AD
Other