GENERAL WORK DESCRIPTION In general, the work to be done under the 2026 Road Rehabilitation - E. 20th Street (State Route 99 NB Ramps to Notre Dame Blvd) Project, consists of the following: • Full depth reclamation (FDR-C) of E. 20th Street from the west curb return of the SR99 NB ramps to Notre Dame Boulevard • Following potholing by the contractor, where full 12” FDR is not feasible due to constraints, shallow drainage pipes and utility conflicts, full depth HMA will be constructed • Minor drainage improvements • Curb ramp replacement • Pedestrian push button improvements • Restriping to incorporate a buffered bike lane along both sides of E. 20th Street The additive alternate bid comprises installation of fiber conduit and vaults and water valve relocation. FUNDING SOURCE This project is funded with Local Measure H funds. ENGINEER’S ESTIMATE The Engineer’s Estimate for this Contract is $4,000,000.00. CONTRACT TIME The Project has 65 Working Days. PREBID OUTREACH MEETING A Prebid out
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 5,095 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today