Public Notice – SRTA RFP 27-02 – Electric Vehicle Charger Station (EVCS) Installations_Fall River

MASOUTHEASTERN REGIONAL TRANSIT AUTHORITYtransitVehicles & Equipment
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
27-02
Open Date
--
Close Date
--
Status
Open

Description

Page |1 Memorandum TO: Prospective Proposers CC: FROM: Southeastern Regional Transit Authority (SRTA) DATE: September 1, 2026 RE: SRTA Request for Proposals (SRTA RFP 27-02) for Electric Vehicle Charger Station (EVCS) Installations – Fall River Background: The Southeastern Regional Transit Authority (SRTA) is responsible for public transit services in ten (10) communities within the Southeastern Massachusetts region, and is funded with Federal, State, and local subsidies, as well as fare box revenue. The SRTA was created pursuant to Commonwealth of Massachusetts General Laws, Chapter 161B, and thus is considered a political subdivision of the Commonwealth of Massachusetts. The SRTA is required to comply with the mandates of the Americans with Disabilities Act (ADA), as are the entities in which it contracts with. The resultant contract is subject to the applicable guidelines for project administration issued by the Federal Transit Administration (FTA) of the U.S. Government Department of Transportation (DOT). Additionally, the resultant contract is subject to financial assistance contracts between the SRTA, DOT-FTA, and the Massachusetts Department of Transportation (MassDOT). All Contractors conducting business with the SRTA must comply with all applicable laws, rules, and regulations in effect. The SRTA reserves the right to reject any or all proposals, or any part of any proposal, that the SRTA deems it in its best interest to do so. Scope of Services: The SRTA is seeking written Proposals from qualified Proposers for the installation of electric vehicle charging equipment at its Fall River Maintenance Facility, located at 601 Brayton Avenue, Fall River, MA 02721. The equipment consists of one ChargePoint Power Link 2000 dual-port dispenser and two ChargePoint Power Blocks. The charging equipment will be furnished by the SRTA, and the selected Contractor shall be responsible for all labor, materials, equipment, coordination, testing, commissioning, and related services necessary for complete installation and activation. Serving the Communities of Acushnet, Dartmouth, Fairhaven, Fall River, Freetown, Mattapoisett, New Bedford, Somerset, Swansea, Westport 700 Pleasant St., Suite 530, New Bedford, MA 02740 srtabus.com, (P) 508-999-5211 (F) 508-993-9196 Page |2 All work associated with this project, including installation, testing, commissioning, and final acceptance by the SRTA, shall be completed no later than June 30, 2027.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Vehicles & Equipment bids open in Massachusetts. 3,264 open bids in Massachusetts — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Sep 2, 2026 | ID: 83615202

Open Vehicles & Equipment Bids in Massachusetts

MAStateOpenSep 8, 2026
Cummins Diesel Engines Parts and Services
BidNet Direct - Massachusetts
Vehicles & Equipment
MACityOpenSep 8, 2026
27-021 - Cummins Diesel Engines Parts and Services
Springfield · #27-021
Vehicles & Equipment
MAStateOpenSep 8, 2026
Automotive Parts and Supplies for the Springfield DPW
BidNet Direct - Massachusetts
Vehicles & Equipment
MACityOpenSep 10, 2026
Generator Maintenance and Repair
Yarmouth · #RFQ-27-DPW-013
Vehicles & Equipment