AUGUSTA WATER NOTICE OF PROPOSED WATER & SEWER RATE SCHEDULE CHANGES The Board of Augusta Water, pursuant to Section 15.2-5136 of the Code of Virginia (1950 as amended), on June 18, 2026 at 1:30 p.m. will hold a public hearing in the Augusta Water Field Operations facility, 846 Laurel Hill Road, Verona, VA, to hear comments on a water and sewer rate schedule with rates increased as shown below. If approved, these rates will have an effective billing date of July 1, 2026. This Notice is provided by action of the Augusta Water Board, May 28, 2026. EFFECTIVE DATE: All billings after July 1, 2026 Meter Size 5/8” 3/4” 1” 1 1/2” WATER Fixed Charge 15.24 22.86 38.10 80.01 2” 3” 4” 144.78 247.65 457.20 6” 762.00 B I-M O N T H L Y U S E R R A T E S SEWER Per 1000 Gallons Per 1000 Gallons Fixed Charge Old New Old New 6.81 7.01 17.34 11.52 11.87 6.81 7.01 11.52 11.87 26.01 6.81 7.01 11.52 11.87 43.35 6.81 7.01 11.52 11.87 89.30 6.81 7.01 11.52 11.87 164.73 6.81 6.81 6.81 7.01 7.01 7.01 277.44 537.54 867.00 11.52 11.52 11.52 11.87 11.87 11.87 Other Fees: Unmetered residential sewer: $113.55/bi-monthly. Septage Fees: In County: $55/1,000 gals Outside Co.: $90/1,000 gals Bi-Monthly Chesapeake Bay Fee: 5/8” – 1” meters $6.00 1-1/2” – 3” meters $20.00 4” and larger meters $50.00 *Greenville Sewer Service Area – Special Fees Apply – See Brochure CAPITAL FEES PER SERVICE CONNECTION = Hookup + Availability + Line Extension Fees W A T E R S E W E R Meter Hookup Fee Availability Fee Line Extension Hookup Fee Availability Fee Line Size Fee Extension Fee 5/8” 1,350 (A) 2,645 C 1,250 (A) 4,900 C 3/4” 2,005 (A) 3,968 C 1,330 (A) 7,350 C 1” 2,025 (A) 6,613 C 1,330 (A) 12,250 C 1 1/2” 4,100 (A) 13,225 C 1,330 (A) 24,500 C NOTES: 2” 3” 4” 6” 4,450 (A) (B) (B) (B) 21,160 42,320 66,125 132,250 C C C C 1,330 (A) 370 (D) 370 (D) 370 (D) 39,200 78,400 122,500 245,000 C C C C A. Where Augusta Water Engineering Staff determines that no new physical connection or upgrade is required the hookup fee may be waived. If a replacement meter is needed, the hookup fee shall be the actual meter/endpoint assembly cost plus $250. • When a developer completes all water & sewer connections within a residential subdivision (5/8” connections only and developer supplies all labor and materials, excluding meter/endpoint assembly and installation) in accordance with Augusta Water Design and Construction Standards, the following hookup fees shall apply: $430 for water, $250 for sewer.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Virginia. 813 open bids in Virginia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today