Proposal for Design-Build Pre-Engineered Metal Building.pdf (1.75 Mb

AZNavajo Nation Oil and Gas CompanytribalConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

The Navajo Nation Division of General Services REQUEST FOR PROPOSAL DESIGN/BUILD PRE-ENGINEERED METAL BUILDING RFP NO: 25-05-3708GC Date Issued: May 30, 2025 INTRODUCTION A. PURPOSE The Navajo Nation Division of General Services (“DGS”) requests proposals from qualified Design-Build Contractors (DBC) to provide planning and construction services for a PreEngineereed Metal Building (PEMB) to replace the old Records Management Warehouse in Fort Defiance, AZ for the Division of General Services (“Offerors”). B. PROJECT LOCATION: 1. Fort Defiance, AZ. 2. GPS Coordinates: 35°44'39.7"N 109°03'12.0"W 3. Map: The proposer who submits the best proposal in terms of best quality and lowest cost on the specified materials will be selected. Adherence to the bid instructions is paramount, otherwise, the bid will be disqualified for non-compliance. If there are any questions regarding this Request for Proposal call Shawnevan Dale, Division Director at (928) 871-6311 or email at sdale@navajo-nsn.gov. The Navajo Nation reserves the right to reject any and all proposals not within the projected budget and may elect to award the contract not solely on the bid amount but on the bidder’s qualification. The due date for the proposal is June 13, 2025, at 5:00 pm, MDST. C. PROJECT DESCRIPTION. 60’x120’x14’ Pre-Engineered Metal Building with minimum specs of: • 60’ x 120’ x 14’ Clear Span PEMB (Design & Construction) • Gabled Roof with 3:12 Roof Pitch • 26 Gauge PBR Roof and Wall Panels Roof - 26 gauge PBR panels in White Wall - 26 gauge PBR panels in tan Trim in Brown • 1 - 10 x10 Roll up door • • • • • • • • • • 2 – Entrance doors 4 – 36”x36” windows with security bars Spray foam insulation on walls and ceilings 2" closed cell spray foam insulation - walls and ceilings HVAC system Interior lighting Exterior Lighting Wall outlets Wind Load of 125 MPH X-Cable Bracing, LEW, REW, FSW, BSW & Roof Gutters and Downspouts D. SCOPE OF WORK 1. Design PEMB with above mentioned specs. 2. Design Monolithic Slab & Footing • Include Electrical (If applicable) and Water/Wastewater infrastructure. 3. Construct monolithic slab suitable for PEMB with demensions of 60’ x 120’ x 14’ 4. The Contractor shall coordinate with the Navajo Tribal Utility Authority and the Navajo Nation in regards to the site utilities. Should utility retirement become necessary, the cost shall be included in the cost proposal 5.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 952 open bids in Arizona — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4146890

Open Construction Bids in Arizona