The City of Bradenton is seeking proposals from qualified respondents to provide progressive design build services to furnish and install a replacement facility for the existing Lift Station 8 Relocation and Collection System Improvements Phase 1, which shall include an upsized lined wet well, new pumps, upsized discharge piping and all necessary electrical and instrumentation components. The new location will be constructed at 1302 4th Ave W Bradenton, FL 34205. The City is looking to have Phase 1 completed by July 1, 2027.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today