Preventative Maintenance And Repair Of Central Plants

AZAgua Fria Union High School DistrictschoolConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
61126
Open Date
Sep 19, 2023
Close Date
--
Status
Closed

Description

Agua Fria Union High School District is seeking to enter into a contract with a qualified vendor to provide cooling and heating through service and maintenance of central plants supplying chilled and hot water at Agua Fria High School including New Directions/Coldwater Academy building, Desert Edge High School, Millennium High School, Verrado High School and Canyon View High School. The District may add other locations throughout the course of the contract as needed.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 9, 2026 | ID: 44622960

Open Construction Bids in Arizona

AZStateOpenTODAY
Fire Station 154 Relocation Construction Manager At Risk
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Relocation Architectural And Construction Administration Services
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Demolition of Six Parcels
BidNet Direct - Arizona
Construction
AZStateOpenAug 14, 2026
Fire Station No. 51 (Go Bond) Architectural Services
BidNet Direct - Arizona
Construction