This project will prequalify construction contractors for the Stockyard Road CIPP project.Work for the City of Pueblo – Stockyard Road CIPP project includes the rehabilitation of the City’s influent trunk sewer from Confluence Park to the James R. Dilorio Water Reclamation Facility (JRDWRF):1. Ultraviolet (UV) cured-in-place pipe (CIPP) rehabilitation of approximately 3,330 linear feet of 60-inch RCP and 299 linear feet of 66-inch RCP trunk sewer; 2. Rehabilitation, removal and replacement, of sanitary sewer manholes on the trunk sewer; 3. Rehabilitation of two (2) concrete vaults and replacement of slide gates and appurtenances with approved epoxy coating and approved polymer concrete inserts; 4. Construction of a permanent cast-in-place concrete Bypass Structure at the start of the 60-inch trunk sewer in Confluence Park; 5. Bypass pumping of trunk sewer flows, collection sewers and service laterals, and restoration of park areas, improved streets and the JRDWRF plant site. The rehabilitation, replacement and construction of all wastewater collection system facilities shall include but not limited to, furnishing and installing all necessary piping, appurtenances, materials, labor and services to provide a complete, fully functioning system. All subsurface utility engineering, utility locates and protection, excavating, excavation support, dewatering, bypass pumping, backfilling, surface restoration to original or specified condition, sampling and testing, required agency coordination and permitting, shall be provided by the Contractor.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Colorado. 1,083 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today