The project includes construction a 10 foot wide concrete multiuse-trail: east-to-west from the existing Lake Minnequa Trail, along the drainage ditch, to Alma Avenue, trailhead improvements at Tucci Lane, and crossing and trail grade improvements at Acero Avenue as well as north-to-south along the right-of-way to Alma Avenue and Tucci Lane then south along the drainage ditch terminating at SH45, Pueblo Boulevard, and trail grade improvements at O’Neal Avenue. Construction will also include lighting, crosswalks improvement, on-street bike lanes, bollards, and some grading.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Colorado. 1,083 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today