The Outdoor Aquatic Center project consists of phased improvements to existing facilities. Phase 1 includes upgrades to the existing bathhouse. Phase 2 involves the rehabilitation of the existing 50-meter pool and the reconstruction and separation of the shallow-depth pool. Add alternates may include enhancements to the admissions area, water slides, shade structures, site lighting, and landscaping
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Kansas. 663 open bids in Kansas — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today