General work description: The general work for this project consists of grading, asphalt, concrete, striping and placing up signage. This project will construct a 12' bike path stretching 0.48 miles from Feather River Blvd to Atherton way in Plumas Lake with five 6-foot cul-de-sac tie-ins.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today