The Work generally consists of: Removal and replacement of existing poured in place (PIP)rubber playground surface material in seven playgrounds. Renovation to existing Fibarplayground surface material in two playgrounds and installing pour in place (PIP) rubberplayground surface material. Project also includes removal of damaged/unused play equipment.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today