This project aims to remove an existing damaged dock and replace it with a new, fully functional EZ Dock floating dock system. Work includes mobilization and general site preparations, safe and compliant demolition of approximately 235 linear feet of existing dock panels, and the complete installation of new dock sections, gangway components, piling brackets, edging, cleats, bumpers, and all associated hardware. The contractor will be responsible for coordinating site access, maintaining safety and environmental best practices, and ensuring all materials and installation meet specified standards. Overall, the project seeks qualified vendors capable of delivering a high‑quality, durable dock system through efficient construction practices and adherence to all project requirements
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 5,008 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today