The project consists of constructing a 380’ pedestrian bridge over the Lake Tarpon Outfall Canal along with Concrete trail approaches and associated drainage and signing and markings. The bridge and approach will Connect to the previously constructed Trail on both approaches. This solicitation is either fully or partially funded with federal funds from the Coronavirus Local Fiscal Recovery Funds made available under the American Rescue Plan Act (ARPA). See Appendix 4 for grant requirements.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today