The scope of work is further detailed in the specifications and includes Landscaping for the Dorchester Boys and Girl Club Fieldhouse Project. Project Location: 301 Mount Vernon Street Dorchester MA. Work must be substantially complete by April 14, 2027. Pre-Bid Meeting: July 30, 2026, 10AM at 301 Mount Vernon St Dorchester MA. This is an active Construction Site, Proper PPE required that includes Hard Hats, Safety Glasses, Vests and Boots. Parking is available for $9 at the Bayside
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Massachusetts. 2,582 open bids in Massachusetts — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today