Pass-A-Grille Way and Gulf Way from 9th Ave. to 22nd Ave. Water Main Improvements Project, 004573A:This project involves the replacement of water mains by HDD and open-cut methods in the City of St. Pete Beach from 22nd Avenue to 9th Avenue between Gulf Way and Pass-A-Grille Way. The new water mains include approximately 225 LF of 6” pipe, 4,900 LF of 4” pipe and 1700 LF of 2” pipe. Included in this contract is the installation of water services, fire hydrants, gate valves, permanent/temporary blowoffs, meter boxes, connections to existing water mains, restoration of affected areas and miscellaneous incidental to construction and miscellaneous items incidental to construction. 62nd Street N Sewer Improvements Project, 004909A:This project plans to extend the existing 8” force main at Pump station 114 further south downstream by approximately 600 linear feet and to construct a parallel 10” gravity sewer by approximately 1000 linear feet along 44th Avenue to increase the pipe capacity of the sewer system in this Kenneth City neighborhood. Included in this contract is the installation of new manholes, gate valves, connections to existing sewer mains, restoration of affected areas and miscellaneous incidental to construction and miscellaneous items incidental to construction.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today