This project consists of Transit Signal Priority (TSP) System along four corridors including the Fiber Optic Communications. The project corridors are: Lake Avenue between California Boulevard and Rio Grande StreetCalifornia Boulevard between Arroyo Parkway and Lake AvenueArroyo Parkway between California Boulevard and Glenarm StreetRaymond Avenue between Glenarm Street and Walnut StreetFoothill Boulevard between Altadena Drive and Halstead StreetThe project consists of installing the following:Transit Signal Priority (TSP) System – Ethernet switches with SFPs, IoT Gateway device, cell modem, various cables, din rail, and miscellaneous appurtenant work.<span style="fo
Unlock the source link for this bid, plus email alerts when similar IT & Technology bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today