Parsley Boulevard Greenway project includes installation of 640 lf of new 10-foot wide concrete sidewalk, removal of curb, gutter and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach and installation of crushed base at alley, installation of drainage appurtenances and relocation of signage and Greenway fence. Contractor shall NOT do any work or store any material within the Interior Heights Addition Blocks 32 & 33 as described on the plans. Project will be within the public right of way in accordance with City of Cheyenne Construction Standards.