Palmer Lane Bridge #1009: Bridge improvement projects to remove and replace the existing bridge over the Foothills Ditch with a 7’x3.25’ concrete box as part of ACHD's Bridge Maintenance Program. Topaz Avenue Bridge #1220: Bridge improvement project to remove and replace the existing bridge over the Five Mile Creek with a 7’x3’ concrete box as part of ACHD's Bridge Maintenance Program
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Idaho. 488 open bids in Idaho — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today