Contract Description: Breakwater Construction; 575 Linear Feet of Stone Revetment, and 37,100 SF (0.85 AC) of fill material (stone) placed into Lake Michigan to maintain a revetment for the purpose of erosion control at the North Point Parking Lot next to Bradford Beach.Content TypeBidBusiness TypeConstructionDepartmentAdministrative Services
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Wisconsin. 1,004 open bids in Wisconsin — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today