This project provides the rehabilitation of Runway 7-25 at the Orlando Executive Airport. The scope of work includes the milling and overlaying of the runway, blast pads, and connecting taxiways within the safety area of the runway. It includes pavement geometric modifications and safety area improvements to meet FAA standards. It will also include rehabilitating the existing runway lighting system, markings, and signage.Please see the Attachments section for the Division 00, Procurement and Contracting Requirements (including Bid Documents, Bid Forms), drawings and specifications.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today