The work in general consists of removal of existing headwalls and culverts, construction of a new bridge and roadway approaches, and rehabilitation of Little Oregon Creek at Oregon Hill Road. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed, or installed.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today