The selected Consultant(s) will be working with various work groups within the Public Works Engineering Services Division including Streets and Sidewalks, Parks, Buildings and Storm Drain. This contract will be open to more than one work group, therefore the consultant may be asked to work on more than one project at a time. All services to be performed by the Consultant(s) shall be documented in a task order to be executed by the Consultant(s) and City. The specified work required for these projects will be determined as the projects are developed including a detailed scope, schedule and budget. Consultant(s) shall provide the City with an hourly rate for Land Surveyor services. Below are descriptions of required tasks for each work group. Streets and Sidewalks, Parks, Building and Storm Drain – Topographic survey services will be used to provide base maps for preparation of plans for proposed improvement projects. The Consultant shall provide the following topographic survey services: Establish survey control line extending 10 feet beyond the limits of work<li style="text-align: justify; margin: 0
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today