The project scope for the base bid includes milling and resurfacing of the existing roadway and connections along with turnout construction and paving at designated locations. Bid options 1, 2, and 3 include additional work to construct turn lanes at NW 15th Street, the GRU water plant, and at Waldo Road, respectively.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today