Northport SS4A Package No 2 REVISED - Raised Curb Channelizer

ALNorthportcityOtherCloses in 6 days
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
26-17
Open Date
--
Close Date
Oct 29, 2026
Status
Open

Description

The City of Northport is seeking materials for a Safe Streets for All (SS4A) demonstration grant project. Raised curb channelizers are included in the scope of this project  See the related PDF documents for detailed specifications and response instructions. See Traffic Calming Project #1 - Hunter Creek Rd near Lakeshore Drive, Traffic Calming Project #2 - Hunter Creek Road near Diamond Ln, and Traffic Calming Project #5 - 26th Ave at 32nd St in the Northport SS4A Concepts related document (PDF). There are dimensions and delineator spacing call outs. This should be enough information to determine the number of end caps and delineators. 36" is the preferred delineator size. Tubular is the preferred style. The delineators along centerlines should be yellow (project #1 & project #5) and white along the pavement edge line (project #2).  See section 707 in the ALDOT construction specification book for sheeting color and size.  The sheeting color should be reflective white on the delineators.  Two - 3" bands would appropriate for size. As long as the delineators are similar in kind to those listed in the ALDOT approved materials publication, they should be acceptable to use.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Alabama. 890 open bids in Alabama — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Oct 14, 2026 | ID: 105171806

Open Other Bids in Alabama