SCO-23-26462-01A Black Mountain Veterans Home HVAC Replacement – Phase 1 The project consists of replacing the existing geothermal heat pump units serving the Main Kitchen, Laundry Room and all occupant rooms with new air-cooled DX units and a dedicated outside air unit (DOAS) for the existing kitchen. The work includes, but not limited to electrical power for new equipment, associated controls, ductwork and piping. The scope of work includes all rough-in of the geothermal piping within the buil
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in North Carolina. 1,376 open bids in North Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today