This project is for the construction of a ten-feet wide, shared use path within the North Branch of Rock Creek Stream Valley Park. Beginning at the southeast end of Lake Frank and extending in a northeasterly direction to MD 115, Muncaster Mill Road, where the project will meet the Emory Lane Trail. A second section connects the end of the paved portion of Rock Creek Trail to the MD 200 Trail, for a combined length of 2.2 miles. The project includes grading and excavation, sediment and erosion control, demolition of excess pavement, storm drain construction, stormwater management construction, bituminous paving, micro-piles installation, elevated concrete trail and bridge installation, and associated construction elements.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Maryland. 1,106 open bids in Maryland — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today