North Area Recovery Station Waste Tipping Shed Floor Overlay

CASacramento CountycountyConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
85774
Open Date
Mar 15, 2024
Close Date
--
Status
Closed

Description

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. The work to be performed in general includes grinding the existing concrete surface of the waste tipping building as needed and indicated on the plans, preparing the existing surface for placement of new flooring surface, installation of a new concrete top layer upon the existing floor of the waste tipping building, and finishing the new surface with sufficient roughness for proper traction.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 1091

Open Construction Bids in California

CAStateOpenTODAY
Ground Transportation Car Wash Design-Build Replacement. Travis AFB, CA
BidNet Direct - California
Construction
CAStateOpenTODAY
2026 Sanitary Sewer and Storm Drain Rehabilitation Project
BidNet Direct - California
Construction
CACityOpenTODAY
Water Treatment Plant Filter Unit Rehabilitation 2026
Shasta Lake · #2026-06
Construction
CACountyOpenTODAY
Cap 41c2408 Marin County Jail Cell Improvements & Related Work
Marin County · #41C2408
Construction