The property currently utilizes twenty (20) existing service panels supplied by multiple distribution points that deliver utility service to various agricultural and related areas (utility delivery) via current transformers (CTs) mounted on distribution poles spanning out to all (20) panels.This project will replace the existing configuration with a centralized, single-phase 120/240V, 1200-amp service distribution point to improve efficiency, reliability, and system consolidation
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in North Carolina. 928 open bids in North Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today