INVITITION FOR BID FOR NATURAL GAS PIPELINE TRANSMISSION PROJECT MAJOR VALVES BID NUMBER 071316 FOR CITY OF SOCORRO, NEW MEXICO City of Socorro 111 School of Mines Rd. Socorro, New Mexico 87801 ISSUE DATE: June 30, 2016 DUE DATE: July 13, 2016 Overview The City of Socorro, New Mexico (City) currently receives it natural gas through a City owned 4inch natural gas transmission pipeline. The length of the pipeline is approximately 38 miles in length and has a maximum allowable operating pressure (MAOP) of 400 psig. The City receives its natural gas from the Kinder Morgan station located west of Belen, New Mexico. The City has experienced growth over the years and during periods of cold weather must curtail certain customers in order to maintain natural gas service to its residential customers. The immediate solution is to increase the MAOP of the 4-inch pipeline from 400 psig to 525 psig. However the existing 4-inch transmission pipeline has valves and other components that restrict increasing the MAOP. To remedy this situation, all of the valves and other components will be replaced with new valves and components that are rated to ANSI 300 (740 psig). In addition the station at the beginning of the 4-inch transmission pipeline (Belen Station) plus the station at the end (Lopezville Station) and the four (4) valve settings in between will be modified to be in compliance with current federal pipeline safety regulations (49 CFR Part 192). These modifications require that all natural gas transmission pipelines be capable of internal inspection using tools called “smart pigs”. The above project must be done while the pipeline is in service. Other components at the following locations will be changed out with higher rated valves. These locations are: Dairy Tap, Duke Lane, Lemitar Cotton Gin, and Eagle Pitcher. Two new taps and regulator stations will be installed at San Acacia and Middle School. An above ground span located north of San Acacia will also be buried. The start date for construction is scheduled for early July 2016 with completion scheduled for mid August 2016. Scope/Specifications BID Package and Specifications For Major Pipeline Valves Only the following valve manufacturers will be considered: Cameron T31 Fully Welded Trunnion Ball Valve API 6D ball valve, full port,6” & 4” raised-face flanged ends, ASME 300 & 600 , CS body with standard NACE trim 4” valves to be lever operated and 6” valves to have a gear operator with wheel.
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in New Mexico. 1,074 open bids in New Mexico — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today