Natural Gas Transmission Pipeline Project

NMSocorrocityWater & Sewer
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
051916
Open Date
--
Close Date
--
Status
Open

Description

INVITITION FOR BID FOR NATURAL GAS PIPELINE TRANSMISSION PROJECT BID NUMBER 051916 FOR CITY OF SOCORRO, NEW MEXICO City of Socorro 111 School of Mines Rd. Socorro, New Mexico 87801 ISSUE DATE: April 28, 2016 DUE DATE: May 19, 2016 Overview The City of Socorro, New Mexico (City) currently receives it natural gas through a City owned 4inch natural gas transmission pipeline. The length of the pipeline is approximately 38 miles in length and has a maximum allowable operating pressure (MAOP) of 400 psig. The City receives its natural gas from the Kinder Morgan station located west of Belen, New Mexico. The City has experienced growth over the years and during periods of cold weather must curtail certain customers in order to maintain natural gas service to its residential customers. The immediate solution is to increase the MAOP of the 4-inch pipeline from 400 psig to 525 psig. However the existing 4-inch transmission pipeline has valves and other components that restrict increasing the MAOP. To remedy this situation, all of the valves and other components will be replaced with new valves and components that are rated to ANSI 300 (740 psig). In addition the station at the beginning of the 4-inch transmission pipeline (Belen Station) plus the station at the end (Lopezville Station) and the four (4) valve settings in between will be modified to be in compliance with current federal pipeline safety regulations (49 CFR Part 192). These modifications require that all natural gas transmission pipelines be capable of internal inspection using tools called “smart pigs”. The above project must be done while the pipeline is in service. Other components at the following locations will be changed out with higher rated valves. These locations are: Dairy Tap, Duke Lane, Lemitar Cotton Gin, and Eagle Pitcher. Two new taps and regulator stations will be installed at San Acacia and Middle School. An above ground span located north of San Acacia will also be buried. The start date for construction is scheduled for early July 2016 with completion scheduled for mid August 2016.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in New Mexico. 1,074 open bids in New Mexico — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 409421

Open Water & Sewer Bids in New Mexico

NMStateOpenSep 30, 2026
Emergency Main Water Line Repair
NM GSD State Purchasing
Water & Sewer
NMstate_agencyOpenOct 13, 2026
Brackish Water Treatment, Exploration, and Production
New Mexico Environment Department · #RFP-US.251410
Water & Sewer
NMStateOpenOct 13, 2026
Brackish Water Treatment, Exploration, and Production
New Mexico Environment Department · #27-667-2010-00027
Water & Sewer
NMStateOpenOct 14, 2026
Raw Water 1B / Raw Water 2 Pipeline Project
BidNet Direct - New Mexico
Water & Sewer