Muscatine Community College Gaekle Hall Remodel Addendum #1

IAEastern Iowa Community Colleges (EICC)universityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

EASTERN IOWA COMMUNITY COLLEGES MUSCATINE COMMUNITY COLLEGE GAEKLE HALL REMODEL February 27, 2026 #24005911 ADDENDUM #1 A. GENERAL ITEMS 1. A Pre-Bid Meeting was held on Tuesday, February 254, 2026. The sign-in sheet from the meeting is attached for reference. 2. To arrange a site visit of the building, contact Blaine Hill, facilities director for Muscatine Community College, cell phone number 563-506-4555. B. SPECIFICATIONS 1. Section 00 41 13 – Bid Form Please use the revised bid form included in this addendum. Alternate 1 rigid insulation thickness has been changed to 5” to match the existing insulation thickness at roof. C. DRAWINGS 1. Drawing A1.03 – Roof Plan Change notes for thickness of new rigid insulation to 5” thickness to match the existing insulation thickness at roof. 2. Drawing A1.06 – Upper & Lower Floor Finish Plans See revised drawing included in this addendum for changes to the accent wall locations and the room finish schedule. 3. Drawing A3.04 – Wall Sections Change notes for thickness of new rigid insulation to 5” thickness to match the existing insulation thickness at roof. D. CIVIL 1. See civil addendum and revised drawings from IMEG attached. E. MECHANICAL, ELECTRICAL, & PLUMBING 2. See MEP addendum and revised drawings from Klingner Associates attached. Enc. CC: All Plan Holders Project #: 26000588.00-Gaekle Hall Remodel 02/27/2026 ADDENDUM NO. 1 Sheet C200-SITE PLAN ADD: − Added note to east side of proposed sidewalk that states “INSTALL EXPANSION JOINT ALONG EDGE AT FULL DEPTH OF EXISTING SIDEWALK”. − Added in detail callout for upper and lower air handling unit pads REMOVE: − Upper and Lower pad note changed to remove the following, “SEE MECHANICAL PLANS FOR PAD DETAILS”. REVISE: − Edited detail callout numbering on storm pipe from “3” to “2”. − Moved storm pipe to align with changed grading and moved note along with it. Sheet C300-GRADING & UTILITY PLAN ADD: − Grading south of proposed sidewalk to allow tie in to storm pipe flow path and the existing retaining wall grades. − Added in flow path to storm pipe on north end of proposed sidewalk. − Grading north of proposed sidewalk added to tie into invert for storm pipe. REMOVE: − Removed original grading limits. REVISE: − Storm pipe invert on north end changed from “651.94” to “651.84”. − Proposed retaining wall top elevation on west end changed to match bottom elevation for flush transition to existing grade.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Iowa. 549 open bids in Iowa — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 725816

Open Construction Bids in Iowa

IAStateOpenTODAY
Council Bluffs Recycle Center Employee Facilities Renovation, Project #BM27-08
BidNet Direct - Iowa Purchasing Group
Construction
IAStateOpenOct 28, 2026
Bowen Science Building - 1st Floor Lab Renovations
BidNet Direct - Iowa Purchasing Group
Construction
IAStateOpenOct 28, 2026
DOC 5JD 150 DSM ST Renovation
BidNet Direct - Iowa Purchasing Group
Construction
IAStateOpenOct 29, 2026
Downtown Commercial Building Demolition
BidNet Direct - Iowa Purchasing Group
Construction