The City of St. Petersburg, Florida (“City”) is seeking the services of qualified experienced consulting firms (“Consultant”) to determine if it is in the City’s best interests to establish a City-owned Municipal Electric Utility (“MEU”) to replace Duke Energy Florida (“Duke Energy”). Phase 1 MEU Feasibility Study (base award) will include all work necessary to evaluate the financial, technical, operational, regulatory, and legal implications of transitioning to an MEU.Phase 2 100% Renewable Powered MEU Comparison (optional award) will produce a comprehensive feasibility study assessing (a) the technical, financial, regulatory, and operational viability of the City’s MEU generating its own 100% renewable energy, and (b) a comparison of that model with citywide participation in Duke Energy Florida’s Clean Energy Connection (“CEC”) program. The resulting report will guide the City’s strategic energy planning and decision-making. Phase 2 findings may require updates to the Phase 1 reports.Phase 3 Alternative municipalization options, draft transition plan, public education and engagement (optional award) will include an evaluation of alternative municipalization options, development of a draft transition plan, and supporting the City in preparing clear, unbiased information for public education and engagement.Phases 2 and 3 may be authorized at the City’s discretion.
Unlock the source link for this bid, plus email alerts when similar Professional Services bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today