Provision of all labor and materials required for the installation of the improvements to the sanitary sewer system with new sewers of approximately 447 LF of 21” PVC, 164 LF of 16” PVC, 2,276 LF of 15” PVC, 171 LF of 10” PVC, 11 EA of 4’ Dia. Manholes, 3 EA of 5’ Dia. Inside Drop Manholes, Rehabilitation of MHs with Epoxy, Temporary Pumping, Dam Evaluation and Restoration, 5 LS of Stream Crossing Restorations and other associated miscellaneous sanitary sewer work.Provision of all labor and materials required for the abandonment of Pump Stations 44 and 45 including removal/salvage of existing equipment; piping; valves; fittings; pavement; structures; miscellaneous features; pipe abandonment; abandonment of 6 EA of air release valve/vaults; abandonment of 8”, 10” and 15’ pipes; and site restoration as defined on the Drawings.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Kansas. 672 open bids in Kansas — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today