Lake Wright Raw Water Pump Station Rehabilitation: The Work under this Project consists of the rehabilitation of the facility, replacing the pumping equipment and above-ground structure while leaving the existing wetwell in place. The project includes the rehabilitation of the existing bulkhead, dewatering and cleaning of the wetwell, demolition and utility locations, installation of an augur-cast pile foundation, the installation of a new above-grade structure and the installation or re-installation of equipment.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Virginia. 775 open bids in Virginia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today