The project is at the Hill Canyon Treatment Plant, 9600 Santa Rosa Road, Camarillo, CA 93012. The general items of work consists of removing all existing caulking in the concrete joints of the flow equalization basin (FEB) nd the existing expansion joint material in the roof joints of the concrete contact channel (if loose and faiiling), preparation of the existing substrate in accordance with the caulkign manufacturer's instructions or as required by the Engineer, installation of the required backer rod and bond breaker tape, installation of the required primer and caulking sealant, legal dispoal of construction waste, and cleanup.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,939 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today