The purpose of this contract is to engineer and design the replacement of the CR-611 NB Off-Ramp bridge over Lake Tarpon Outfall. The objective is to complete reconstruction of this bridge by January, 2030. This project must be coordinated with the Project Development & Environment Study being performed for the East Lake Road corridor from SR 586 (Curlew Road) to north of Trinity Boulevard.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today