The Project consists of rehabilitation and refurbishment efforts at the Long Term Parking Garage (LTPG) at Tampa International Airport. Level 6 of the LTPG will be repaired, waterproofed, and the entire area will be re-striped. Stair towers will be repaired and waterproofed, the roofs of the stair towers, elevator penthouses, and Alstom office at the LTPG will be removed and replaced. The Alstom office exterior at the LTPG will be waterproofed.Furthermore, the Project involves the removal and replacement of critical fire protection components within the LTPG fire pump room. The scope includes replacing the existing fire pump, jockey pump, controllers, associated piping, grooved fittings, and electrical connections. The upgraded system will meet current fire protection standards, improve reliability, and address aging infrastructure to enhance the overall safety and operational functionality of the facility.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today