The City of Lebanon is soliciting bids to reconstruct the existing 30-year-old North Terminal Apron, generally within the existing footprint, located at Lebanon Municipal Airport.The work will include the installation of temporary erosion and sedimentation control, pavement reclamation of the existing pavement and base/subbase materials, removal and regrading of the reclaimed material within the existing limits, removal of abandoned utilities, adjusting drainage structures to future grades, installing new pavement tie downs, markings and other incidentals to complete the project.Projects construction start date is anticipated to begin in the fall of 2023 and last 45 calendar days. Contractors will access the project area through Gate 'H' and their staging area will be in the western most portion of the airport’s public parking lot.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in New Hampshire. 472 open bids in New Hampshire — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today