The City of Santa Cruz operates and maintains the City's wastewater collections infrastructure. The City of Santa Cruz Public Works Department is looking. The work for this project consists, in general, of removing 961 linear feet of the existing 6” vitrified clay pipe and replacing it with new 8” pipe along Laurent St east of Mission St to California St. The work also includes replacing sanitary sewer manholes, replacing sewer laterals on public right-of-way, street pavement, with other related construction activities.Engineer's Estimate: $878,000.00
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today