Existing Beach Access Structures were damaged during Hurricane Dorian. This project will replace those damaged structures and will utilize a hazard mitigation design using flow through decking. This project has two locations, the first being the stairway access and ADA ramp access for Mary McLeod Bethune Park and the second location being the Kingfish Avenue Public ADA Access and Beach Safety equipment ramp access to Bethune Beach.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today