General work description:The work generally consists of items listed below and is located on Junipero Serra Boulevard between Hickey Boulevard and Avalon Drive in South San Francisco, CA. A detailed scope of work is included in the bid documents.Mobilization and demobilizationProvide notification and postings required by the special provisions and specifications;Provide traffic control throughout the duration of the project per the approved traffic control plan;Furnish and install roadside sign panels and postsRemove existing striping and markings and install new pavement striping, markings and markers;Install green pavement markings;Furnish and install K-71 bollards.The engineer’s estimate for this work is $430,000. Detailed scope of work is included in the bid documents.The Contractor shall be responsible to furnish all labor, material, tools, equipment, incidentals and services necessary to complete all the work as specified and in accordance with the plans and specifications.
Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today