General work description: Rehabilitate 2,306 linear feet of 72-inch diameter joint intercepting sewer (sewer interceptor) reinforced concrete pipe between MH-04 and JB-1 as well as another 89 linear feet of sewer interceptor between JB-1 and JB-0. The scope of work includes, but is not limited to, the following: rehabilitation of MH-03 and MH-02; bypass pumping around the intercepting sewer; pipeline cleaning and rehabilitation; disposal of waste; manhole and lateral reinstatement; bypass system removal and reinstatement of intercepting sewer service; and restoration of disturbed areas.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today