Decommissioning the fuel tanks at the Silverton Facility at 4598 Cascade Hwy, Silverton, OR. Work includes obtaining a DEQ permit to decommission an underground storage tank, soil testing and contaminated soil removal as called for in the Plans and Specifications, and such Incidental Work as requested by the Engineer. The estimated project cost range is $50,000 to $100,000.
Unlock the source link for this bid, plus email alerts when similar Vehicles & Equipment bids open in Oregon. 1,199 open bids in Oregon — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today