The Contract is for the City of Port St. Lucie James E Anderson Water Treatment Plant CO2 System Addition. The Work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: One (1) new bulk liquid carbon dioxide storage tank complete with refrigeration system, vaporizer, vapor heaters, pressure regulators and associated electrical equipment and controls on a new case in place concrete slab.One (1) new carbon dioxide solution feed panel and controls.Two (2) centrifugal carrier water booster pumps.New carbon dioxide solution piping and diffusers.All associated piping, valves, electrical, controls and appurtenances required andas shown on the Drawings. <
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today