'Project DescriptionThis section outlines the scope of the installation of an 18-inch Fusible Polyvinylchloride (FPVC) force main to improve wastewater infrastructure. The project includes site preparation, clearing, excavation, trenching, horizontal directional drilling (HDD), jack-and-bore crossings, utility connections, and final site restoration. Contractors must implement erosion control, traffic management, and public safety measures while maintaining continuous service for existing utilities. Strict compliance with Kinder Morgan gas line crossing permits, environmental regulations, and project specifications is required. Deliverables include as-built drawings, pressure test reports, and final project documentation.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Georgia. 2,050 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today