High-resolution spec/plans for FY2023 Pickles Butte Sanitary Landfill Dust Control System Project (pt. 2)

IDCanyon CountycountyWater & Sewer
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

1 3 2 5 4 LIGHTING SYMBOLS 6 DEVICES & EQUIPMENT 7 ONE-LINE SYMBOLS PROJECT ELECTRICAL GENERAL NOTES X 2'X4' GRID MOUNT LIGHT SIMPLEX RECEPTACLE, +18" AFF (UNO) *W/ EMERGENCY BATTERY DUPLEX RECEPTACLE, +18" AFF (UNO) 2'X2' GRID MOUNT LIGHT DUPLEX REC. (HALF SWITCHED), +18" (UNO) *W/ EMERGENCY BATTERY GFCI - DUPLEX RECEPTACLE, +18" (UNO) 4' SURFACE WRAP DOUBLE DUPLEX RECEPTACLE, +18" AFF (UNO) *W/ EMERGENCY BATTERY GFCI - DOUBLE DUPLEX REC., +18" (UNO) X STRIP LIGHT (LENGTH AS SHOWN) SPECIAL CONNECTION, +18" AFF (UNO) X *W/ EMERGENCY BATTERY DUPLEX FLOOR RECEPTACLE LINEAR PENDANT MOUNT (LENGTH AS SHOWN) DOUBLE DUPLEX FLOOR RECEPTACLE --- X RECESSED CAN LIGHT SINGLE SWITCH, +46" AFF (UNO) --- X *W/ EMERGENCY BATTERY D DIMMER SWITCH, +46" AFF (UNO) ----- PAD MOUNTED TRANSFORMER X F 1. ALL WORK TO BE COMPLETED PER THE LATEST ADDITION OF NATIONAL ELECTRICAL CODE (NEC) ADOPTED BY THE AHJ AND ALL LOCAL CODES AND RESTRICTIONS. 2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PERMITS, TESTS AND INSPECTIONS THAT MAY BE REQUIRED DURING CONSTRUCTION. 3. THIS DOCUMENT SET IS TO BE CONSIDERED THE CONSTRUCTION DOCUMENTS INCLUDING ALL DRAWINGS, DETAILS, SCHEDULES AND SPECIFICATIONS. ANY DISCREPANCIES OR ISSUES SHOULD BE IMMEDIATELY BROUGHT TO THE ENGINEERS ATTENTION FOR CLARIFICATION. 4. ALL MATERIALS PROVIDED AND INSTALLED SHALL BE UL LISTED AND SHALL BE NEW UNLESS OTHERWISE NOTED. 5. ALL DEVICES, EQUIPMENT, CONDUIT, ETC. SHALL BE FLUSH MOUNTED OR CONCEALED IN WALL UNLESS OTHERWISE NOTED. 6. ELECTRICAL CONTRACTOR TO COORDINATE WITH OTHER TRADES TO AVOID INSTALLATION CONFLICTS PRIOR TO ROUGH-IN. 7. HACR RATED BREAKERS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT. 8. ALL BRANCH CIRCUITS AND FEEDER CIRCUITS ARE TO BE PROVIDED WITH SEPARATE APPROPRIATELY SIZED GROUNDING CONDUCTOR. 9. ALL WIRE IS SIZED BASED ON 75°C COPPER. COMPACT ALUMINUM IS APPROVED FOR ALL BRANCH AND FEEDER CIRCUITS OVER 100A (UNLESS COPPER IS REQUIRED BY EQUIPMENT MANUFACTURE, VERIFICATION IS THE RESPONSIBILITY OF THE CONTACTOR). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UPSIZE CONDUIT AND CONDUCTORS AND VERIFY TERMINATION REQUIREMENTS AS REQUIRED IF ALUMINUM IS USED.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Idaho. 491 open bids in Idaho — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 7, 2026 | ID: 43029166

Open Water & Sewer Bids in Idaho

IDStateOpenTODAY
GAOA Island Park Sewer System Replacement, Caribou-Targhee National Forest
BidNet Direct - Idaho Purchasing Group
Water & Sewer
IDCityOpenSep 16, 2026
Sewer Mainline Replacement Kendall St – Phase 2 (RSP 497)
Boise
Water & Sewer
IDStateOpenSep 16, 2026
FY27 Stormwater Basin and Swale Vegetation Management Services
BidNet Direct - Idaho Purchasing Group
Water & Sewer