This Contract is for the construction of the Hart Avenue Drainage and Water Main Improvements. This project is located just west of US-1 between W Pine Bluff St and W Connecticut Ave., Edgewater Florida. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following:Drainage improvements consisting of: installation of approximately 3,300 LF new storm pipe, 34 concrete storm structures, associated utility adjustments, re-grading existing stormwater conveyances and creation of new swales. Also including demolition of an existing flood-prone house and converting the property into a stormwater pond. Storm piping consists of approximately 1,300LF of 12" to 24" diameter piping and approximately 2,000LF of 36" to 48" diameter piping.Water Main improvements consisting of: approximately 3,600LF of 6” C-900 PVC water main, 1,600LF of 2” polytube, directional drill 1,350LF of 6” Fusible PVC C-900 DR, 8 fire hydrants and adjusting utilities accordingly. Gate Valves, Tapping Sleeves, and Insertion Valves will also be installed per plans and specs.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today