General Contractors-Track and Soccer Stadium

ARUniversity of Arkansas at Pine Bluff (UAPB)universityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
RFQ General Contractors
Open Date
Jun 23, 2023
Close Date
--
Status
Open

Description

RFQ |TRACK AND SOCCER STADIUM PROJECT Request for Qualifications – General Contractors TRACK AND SOCCER STADIUM PROJECT The University of Arkansas at Pine Bluff, in accordance with policies of the Board of Trustees, is soliciting responses from interested firms to provide a general contractor construction management services for the Track and Soccer Stadium. PROJECT DESCRIPTION The University of Arkansas at Pine Bluff seeks qualified contractors for the construction of a new track and soccer complex located on the main campus in Pine Bluff, Arkansas. The complex will be a state-of-the-art venue that includes, but not limited to a 9-lane Bynum NCAA track, artificial turf, field events outside of the oval, bleachers, lighting, parking, a chip rock-walking path, and concessions. PROJECT SCOPE The track infield is estimated to cover 2 acres and the perimeter, 12 acres. Phase one of the project shall include site prep, track, artificial turf, field events, bleachers, lighting, and a support building. Track installation: Bynum Track, curb, surface, Dzones, side Long Jump and Triple Jump areas. High Jump and Pole Vault areas. Installation of a field turf soccer field. Field events, outside oval for throwing areas. Lights, and a parking plan to support a new or expanded facility. The pole vault and jumping pits should be reversible and contain two sets of runways to accommodate multiple events. The infield will be a multipurpose turf field that meets the NCAA playing regulations for Collegiate Soccer. This phase will consist of developing a throwing area for the discus, javelin, hammer throw, and shot-put throw as well as hammer cage(s) to accommodate multiple throwing events. PROJECT COST The total project cost is currently estimated at $7 to 8 million. General contractors and design consultants will work with Facilities Management and the Athletic Director to advance campus master planning and design principles, as well as sustainability requirements. PREFERRED EXPERIENCE 1. 2. Respondents should be familiar with and sensitive to NCAA and SWAC rules and regulations, and mindful of the partnerships established by each association.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arkansas. 551 open bids in Arkansas — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 12, 2026 | ID: 6305853

Open Construction Bids in Arkansas

ARCityOpenSep 8, 2026
Residential Demolition – 1610 S CEDAR ST
Little Rock · #ITQ-US.251927
Construction
ARCityOpenSep 8, 2026
Residential Demolition – 2924 W 12th St
Little Rock · #ITQ-US.251441
Construction
ARCityOpenSep 8, 2026
Residential Demolition – 1311 BISHOP ST
Little Rock · #ITQ-US.251890
Construction
ARCityOpenSep 8, 2026
Residential Demolition – 2410 W 12TH ST
Little Rock · #ITQ-US.252136
Construction