DH and DHR are located next to each other and GRU has identified a strategy for three water sharing capabilities that will lead to a reduction of groundwater from the wells, a reduction of overall water usage across the sites, reduction of production costs, reliability of our systems, and decrease of landfill solid waste: This project will connect DH and DHR by installing 10" HDPE piping and 6" HDPE piping between the two sites.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today